This project consists of both new construction and renovation of the existing building. The project was divided into two phases. Phase one involved a large amount of structural demolition and an extensive amount of new construction that tied the existing structure together. The demolition was more selective in phase 2, with the majority of the main structure being preserved. In both phases, a number of the structures received overbuilt roofs to provide for a more unified looking structure and better drainage.

Size: 47,681 Sq. Ft. Mod - 23,966 Sq. Ft. New
Project Cost: $10,000,000
Construction Cost: $7,900,000

Project Address

241 N Military Road
Winlock, WA 98596

Architects:

Harder
JFC Architects

General Contractor:

Slayden Construction

Client:

Winlock School District 232

CSG Services Provided: