Dallesport Elementary School

The school was constructed with durable and proven materials chosen to resist the severe climate of the Columbia River Gorge. Material color and texture was chosen to blend with the dramatic setting and create a building that respects its surroundings and will never be out of date. The project included relocating the existing portables and demolishing the existing school facilities. The building has a capacity for 250 students.

Size: 19,500 Sq. Ft. New
Project Cost: $2,585,000
Construction Cost: $2,037,000

Project Address

325 6th Avenue
Dallesport, WA 98617

Architect:

JFC Architects

General Contractor:

Betz Construction

Client:

Lyle School District #406

CSG Services Provided:

View Complete Program List »